column value
Title 細懸浮微粒(PM2.5)手動監測計畫(北區)
Abstract 本計畫執行期間為101年11月7日至103年11月6日止。計畫目標為執行全國(北區)PM2.5質量濃度手動監測,計畫執行區域包含基隆(測站編號001)、汐止(測站編號002)、板橋(測站編號006)、士林(測站編號011)、萬華(測站編號013)、桃園(測站編號017)、花蓮(測站編號063)、陽明(測站編號064)、宜蘭(測站編號065)及馬祖(測站編號075)等共10測站。手動監測頻率為每3天1次,採樣時間為指定日期之凌晨零時至24時,連續24小時之採樣。本計畫手動監測作業時間限定如後:(1)採樣日前12小時需完成放樣作業,(2)採樣日後12小時需完成取樣作業.樣品取出後需在24小時內送回實驗室進行後續調理分析。本計畫由台灣檢驗科技股份有限公司負責6站次(馬祖、花蓮、士林、萬華、板橋、桃園)之採樣及北區10站次之濾紙檢驗分析,台旭環境科技中心股份有限公司負責4站次(基隆、汐止、陽明、宜蘭)之採樣工作。第1年度北區應完成1230站次之採樣,其中有效樣品為1189站次,採樣作業暫停15站次,採樣失敗為26站次,資料可用率約為96.7%。第2年度北區應完成1130站次之採樣,其中有效樣品為1079站次,採樣作業暫停26站次,採樣失敗為25站次,資料可用率約為95.5%。2年合計應完成2360站次之採樣,其中有效樣品為2268站次,採樣作業暫停41站次,採樣失敗為51站次,整體資料可用率約為96.1%。
EngTitle The Monitoring of Fine Suspended Particulate(PM2.5) in the Northern Part of Taiwan.
EngAbstract This project started from November 7th 2012 and will end on November 6th 2014. The project goal is using manual method (NIEA A205) to monitor PM2.5 in Northern Taiwan at 10 monitoring stations: Keelung(station number:001), Xizhi(station number:002), Banqiao(station number:006), Shilin(station number:011), Wanhua(station number:013), Taoyuan(station number:017), Hualien(station number:063), Yangming(station number:064), Yilan(station number:065) and Matsu(station number:075). The PM2.5 samples were collected once every 3 days with 24h sampling time continuously from 00:00 to 24:00 on appointed day, simultaneously at all stations. Some rules should be followed: (1) Before sampling start, filters should be set up in samplers within 12 hours. (2) From the end of sampling, filters should be taken out from samplers within 12 hours. (3) All samples should get in to lab (SGS) within 24 hours after drawn out form samplers.Field sampling were performed by two companies (SGS & TAET), and SGS analyzed those samples. SGS took charge of sampling at 6 stations including Matsu, Hualien, Shilin, Wanhua, Banqiao and Taoyuan. TAET did sampling of the other 4 stations including Keelung, Xizhi, Yangming and Yilan. At the first stage (2012/11/7~2013/11/30), 1230 samples should be accomplished. In the end, 1189 samples were available, 26 samples were failed, and 15 samples were suspended. The rate of achievement was 96.7 %. At the Second stage (2013/12/01~2014/11/06), 1130 samples should be accomplished. In the end, 1079 samples were available, 26 samples were failed, and 25 samples were suspended. The rate of achievement was 95.5 %. Totally, the project had 2360 samples should be accomplished. In the end, 2268 samples were available, 51 samples were failed, and 41 samples were suspended. The rate of totally achievement was 96.1 %.
ProjectYear 101
SponsorOrg 監資處
ExecutingOrg 台灣檢驗科技股份有限公司
PublicFullVersionURL http://epq.epa.gov.tw/project/filedownload.aspx?fid=84017