column value
Title 100年度嘉義市固定污染源許可稽查管制及空污費催補繳查核計畫
Abstract 本計畫工作小組,今年度各項工作執行成果摘要如下:1.落實法規制度本計畫目前執行各項檢測作業,包含20點次油品硫含量稽查抽測、異味官能測定及周界粒狀物稽查抽測各5點次、排放管道3根次、加油站氣油比及氣漏檢測12站、焚化廠RATA及重金屬檢測各1根次,除1件次異味檢測不合格外,各項檢測皆符合法規。而在空污費徵收方面,完成98年第4季至100年第2季空污費徵收審查作業,總計62廠次空污費徵收作業,平均申報率及到繳率為100%。硫氧化物及氮氧化物空污費查核方面,目前共計完成51件次,揮發性有機物空污費查核方面共計完成58家次查核。本年度查核場所中,僅2廠申報有誤,但皆不影響繳費金額,仍屬應繳納最低金額900元。本計畫小組已現場輔導改正,並協助重新推估排放量。2.推動許可制度本年度計有16件許可申請案件,分別為操作許可換補發2件次,以及許可異動申請9件及操作許可展延5件次。其中,駁回1件次許可展延申請,核發14張操作許可證,1件許可異動案件補正中(12月12日提出申請),平均審查日數10日。本計畫為有效落實許可制度,執行許可查核43件次,業者均符合法規。3.更新固定源排放清單本年度更新及維護資料庫QA/QC作業132件,經更新後,嘉義市固定污染源總列管公私場所為354家。由完成建檔的固定污染源資料庫資料統計顯示,製程污染排放量部分,粒狀污染物為41.74公噸/年、硫氧化物21.70公噸/年、氮氧化物115.20公噸/年、揮發性有機物136.76公噸/年、一氧化碳33.94公噸/年。4.相關作業計畫目前共完成稽巡查作業527件次、辦理4場人員教育訓練及2場宣導說明會。此外,本計畫小組於計畫期間辦理1場次空氣污染突發事件緊急應變演練,提升本市突發事件之應變能力。
EngTitle The stationary pollution sources in Chiayi City
EngAbstract From March 4, 2011 to December 11, 2011, the results of the work are summarized as follows:I. Implementation of the rules and regulationsThis project is currently running all the test operations, including 20 periods of the detection sampling tests of sulfur content in oil, odor sensory measurement sampling tests and detection sampling tests of the perimeter granular materials, 5 periods respectively, discharge pipe three, gas station oil ratio and leakage detection 12 stations, and incineration plants RATA and heavy metal detection 1 time. Except for one odor detection not meeting the standard, the other tests all met the standard in compliance with laws and regulations. In the aspect of air pollution fee collection, the air pollution fee collection procedures have been completed from the 4th quarter of 1998 to the second quarter of 2011. A total of 62 plants have completed their procedures of air pollution fee collection. The average declaration rate, fee-paying rates and late fee-paying rate are 100 %. As for the sulfur oxides and nitrogen oxides air pollution fee check, , currently a total of 51 has been completed. As for the check of air pollution fee for volatile organic compounds, a total of 58 has been completed. In this year, places being checked, there were only 2 incorrect declaration, which didn’t affect the payment amount, and the still minimum amount of fee is NT$ 900. The project team has been corrected on-site, counseling and helping to re-estimate the emission amount.II. Promotion of the licensing systemThis year till December 11, there were eight cases of permit applications, which were 2 replacements of operating licenses and 4 applications of permit transaction and extensions of operating licenses respectively. Among them, one case of application for license extension was rejected. The other ten operating permit application have been reviewed and issued nine licenses and the other three operating license application has been approved and has entered the license-making permit. The plan was made for the effective implementation of the licensing system. There were 43 implementing license check. And all the industries were in line with the industry regulations.III. Updating the list of stationary emission sourcesAt this stage, there are 132 updates and maintenance of the database QA / QC operations. After the updates, the total controlled public and private place for the stationary pollution sources in Chiayi City are 354. From the filing-completed stationary sources database statistics, it showed that in the part of process pollution emissions the particulate pollutants are 41.74 tons/year, SOx, 21.70 tons/year, nitrogen oxides 115.20 tons/year, volatile organic compounds 136.76 tons/year, and carbon monoxide 33.96 tons/year.IV. Related jobsIn the project, we have now completed a total of 493 cases on protracted inspection operations, held four staff education and training conventions and two advocacy briefings. In addition, the project team has organized a drill during the incidents of air pollution emergency to enhance the emergency response capabilities in the city.
ProjectYear 100
SponsorOrg 嘉義市政府環境保護局
ExecutingOrg 瑩諮科技股份有限公司
PublicFullVersionURL http://epq.epa.gov.tw/project/FileDownload.aspx?fid=27190